A photo of your electricity bill is all we need to get started.
We reply within 24 business hours with a fixed-price proposal: equipment, installation, the paperwork with CFE (Mexico's federal electricity utility) and warranty — everything itemized.
The problem with requesting three solar quotes is that none of them include the same things, so you can't compare them. Ours always comes with the same itemized breakdown.
One final number with VAT included, not a marketing range. If anything changes after the site visit, we tell you before installing — not on the invoice.
Panels, inverter, mounting structure and protections, with the brand, model and warranty of each. That way you can truly compare against any other quote.
Not a generic average: we calculate on your actual consumption over the last 12 months and show you the exact month you recover your investment.
These are the ranges we actually work with in Querétaro. Your final number comes out of the technical site visit, but it rarely falls outside these.
$30,000 – $50,000 MXN
$50,000 – $70,000 MXN
$65,000 – $250,000 MXN
Installed prices, with the CFE interconnection paperwork included. We offer monthly financing with no down payment through partner banks.
We don't do telemarketing. Send us your details, receive your proposal, and from there you decide whether to move forward.
Two minutes. The only must-have is your CFE bill: without it, any number anyone gives you is a guess.
It arrives by email and WhatsApp within 24 business hours, with the full breakdown and a savings projection based on your actual consumption.
Only if you want to move forward. We come out to measure, confirm the price, and from there the decision is yours.
You're going to request two or three quotes, and that's fine. These are the questions that separate a serious quote from one that looks cheap and ends up expensive.
The inverter is the component that fails first and carries the shortest warranty. If a quote doesn't state brand and model, it can't be compared to any other.
Interconnection is a formal process with its own technical requirements and timelines. Some installers leave it out of the price and it shows up later as an extra.
If the projection isn't built on your actual twelve months of bills, it's a generic average and it will be wrong.
On a flat concrete roof, the structure and anchoring system determine whether your waterproofing survives. It's where corners get cut without you noticing.
A product warranty is not the same as the panel's power-output warranty, nor the inverter's. Ask for all three separately.
It matters for the warranty: if the installer disappears, who answers for the work? We work with our own in-house crew.
Fill out the form and have your CFE bill handy. The more complete your answers, the more precise the number we send back.